Quiz Summary
0 of 180 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 180 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
- 116
- 117
- 118
- 119
- 120
- 121
- 122
- 123
- 124
- 125
- 126
- 127
- 128
- 129
- 130
- 131
- 132
- 133
- 134
- 135
- 136
- 137
- 138
- 139
- 140
- 141
- 142
- 143
- 144
- 145
- 146
- 147
- 148
- 149
- 150
- 151
- 152
- 153
- 154
- 155
- 156
- 157
- 158
- 159
- 160
- 161
- 162
- 163
- 164
- 165
- 166
- 167
- 168
- 169
- 170
- 171
- 172
- 173
- 174
- 175
- 176
- 177
- 178
- 179
- 180
- Current
- Review / Skip
- Answered
- Correct
- Incorrect
- Question 1 of 180
1. Question
A development team is closely working with the customer to design wireframes for each story. The every feature is going in development after the agreement of the client using these wireframes. Initial iterations went well, but in fifth iteration client simply rejected the work by saying this is not what I wanted to. What could be the reason behind the situation?
CorrectIncorrect - Question 2 of 180
2. Question
When should you freeze acceptance criteria for a user story?
CorrectIncorrect - Question 3 of 180
3. Question
In an effort to facilitate close communication with external stakeholders, management has decided to co-locate a subject matter expert from customer side with the team. The team however is resistant to the idea – they fear it will create unnecessary work pressure and may expose the team’s internal issues and weaknesses to the customer. As an Agile Practitioner, what would you consider your best first move?
CorrectIncorrect - Question 4 of 180
4. Question
The project sponsor from the customer’s side doesn’t like most of what she sees in the product demo just before the first release of the product. And now the whole release could be in jeopardy. What do you think could possibly be the root cause of this situation?
CorrectIncorrect - Question 5 of 180
5. Question
Joy met with Sally so that he could describe in detail the change the customer wanted to make into a key feature of the product. While Joy talked about the technical specifications, Sally made eye contact with Joy. When Joy felt that all the details had been covered, Sally asked if she could repeat back her understanding to make sure it was complete and clear. In this scenario, sally is applying what technique?
CorrectIncorrect - Question 6 of 180
6. Question
In a typical business complex and mid-sized agile project, what does the team attempt to develop every Sprint?
CorrectIncorrect - Question 7 of 180
7. Question
An agile team finished coding for the current iteration. Which of the following is a continuous process improvement ceremony that the team will now attend?
CorrectIncorrect - Question 8 of 180
8. Question
An agile project sponsor has requested to see the impact of the scope changes requested by the customer throughout the lifecycle of the project. What information radiator would an agile practitioner recommend to the sponsor to look at?
CorrectIncorrect - Question 9 of 180
9. Question
Your team is averaging 40 story pointsper two-week iteration.they have 200 points’ worth of functionality left in the user story backlog.How many weeks can we expect it will take until development is completed?
CorrectIncorrect - Question 10 of 180
10. Question
An agile team is demonstrating a recently developed product. Who determines when a product is complete?
CorrectIncorrect - Question 11 of 180
11. Question
During Sprint Review, customer wants some enhancements to a feature that was completed during the Sprint and was accepted by the Product Owner. How should the team deal with such changes?
CorrectIncorrect - Question 12 of 180
12. Question
Team members are not happy as the product owner often sets up informal meetings for project status update, which is impacting their scheduled plan to meet the iteration goal. What can be Servant Leader’s best course action to manage the given situation?
CorrectIncorrect - Question 13 of 180
13. Question
Does estimation differ for product backlog (PB) items and the sprint backlog (SB) items?
CorrectIncorrect - Question 14 of 180
14. Question
Why do Agile methods recommend frequent reviews of work products via code reviews, testing and product reviews?
CorrectIncorrect - Question 15 of 180
15. Question
Product Owner wants to include an urgent story into the current Sprint – on day 3 of a 2-week Sprint. How should the development team respond to this request?
CorrectIncorrect - Question 16 of 180
16. Question
Agile earned value management is most appropriately applied at which level?
CorrectIncorrect - Question 17 of 180
17. Question
The product owner of an agile project has the responsibility of grooming the product backlog. Grooming involves prioritizing and re-prioritizing user stories on a regular basis. As an agile best practice, which of the following criteria are most important for the owner to use when grooming the product backlog?
CorrectIncorrect - Question 18 of 180
18. Question
While working on a hybrid project, an agile practitioner is responsible to perform the duties of both the project scrum master and provide project performance reports periodically to the senior management. The project sponsor suggests the agile practitioner that track the velocity of each team member individually instead of tracking the team velocity to monitor the progress of the project. What would the agile practitioner do as per agile best practices?
CorrectIncorrect - Question 19 of 180
19. Question
In creating the team space, what feature provides the most effective method of communication?
CorrectIncorrect - Question 20 of 180
20. Question
As per agile estimating tools and techniques So, Affinity estimating allows a team to:
CorrectIncorrect - Question 21 of 180
21. Question
After the end of the fourth sprint, the agile team members reported that they were unable to complete all user stories to be delivered in the sprint since the product owner pushed too many story points for the last sprint. As a result, the team had to work overtime and eventually got burned out. The product owner wants to hold the team accountable for the sprint failure. What is the best course of action for the team in this situation?
CorrectIncorrect - Question 22 of 180
22. Question
The Scrum Master has been a technical architect in his previous role. During a Sprint Planning session, he notices team is opting for a solution approach that he feels has a high risk of failure. What should the Scrum Master do?
CorrectIncorrect - Question 23 of 180
23. Question
What is the BEST way to estimate the cost of a project?
CorrectIncorrect - Question 24 of 180
24. Question
How might a spike be helpful to an agile team?
CorrectIncorrect - Question 25 of 180
25. Question
In a Sprint review meeting, the product owner dismisses the sprint and recommends the newly appointed Scrum Master to arrange Agile coaching for the team. Team really worked hard to meet the sprint goal and came up with a detailed PowerPoint presentation for the sprint review meeting. What went wrong in the situation mentioned above?
CorrectIncorrect - Question 26 of 180
26. Question
In a Scrum team, who is responsible for the success or failure of the project?
CorrectIncorrect - Question 27 of 180
27. Question
Tom is the newly appointed Project Manager of a software development project which has high degree of uncertainties and scope is not yet fully defined. Considering all the factors, he decides to adopt Agile development approach for running the project. Now, he has to come up with an initial cost estimate before the project work begins. What can be the best approach for the preparation of initial cost estimate as per the stated scenario?
CorrectIncorrect - Question 28 of 180
28. Question
A scrum team that has been working on an agile project, is arguing over the story points in the sprint meeting planning. The product owner is pushing the team to complete 170 story points of user stories in the next sprint whereas the average velocity of the development team is 150 story points per sprint. Who will make the final decision to fix the number of story points to be completed in a sprint?
CorrectIncorrect - Question 29 of 180
29. Question
You are an Agile practitioner working on an agile project using the Scrum framework. The primary purpose of a Sprint Review is for the team to?
CorrectIncorrect - Question 30 of 180
30. Question
Which role is responsible to prepare the release plan?
CorrectIncorrect - Question 31 of 180
31. Question
You have been assigned a New Project that is large, complex and uncertain. As a Project Manager, you will be using agile project management. Which of the following will you select while creating your team?
CorrectIncorrect - Question 32 of 180
32. Question
A team needs to perform various activities during Sprint Planning meeting. Which of the following activities should ideally be completed before Sprint Planning starts?
CorrectIncorrect - Question 33 of 180
33. Question
You are working as a product owner and part of the project that is assigned to you now is to get a piece of the project from a vendor. One of the vendors invites you for a special dinner to discuss this area of the project. What should be your reply to this invitation?
CorrectIncorrect - Question 34 of 180
34. Question
The team is struggling to reach a consensus on the estimate for a story that involves a new technology the team is not much familiar with. What should the team do?
CorrectIncorrect - Question 35 of 180
35. Question
What would be your most important recommendation to the management who are procuring new office space and there is a plan to transition from traditional project management to agile?
CorrectIncorrect - Question 36 of 180
36. Question
During the iteration planning meeting, you come across a story whose development does not fit into an iteration. What is the BEST thing to do next?
CorrectIncorrect - Question 37 of 180
37. Question
The project team is using Iteration burn-down chart to predict the remaining work in the current iteration backlog. Iteration Burn-down chart is an example of which of the following tools and techniques?
CorrectIncorrect - Question 38 of 180
38. Question
A Lean team employed a technique to analyse the flow of information and materials through system to identify value adding and non value adding activities. This technique is called:
CorrectIncorrect - Question 39 of 180
39. Question
Which of the following is not a feature of an Agile team?
CorrectIncorrect - Question 40 of 180
40. Question
You are a scrum master of scrum team. The new team member has just joined the team and has a very little experience in the domain you are working in. How should you manage him?
CorrectIncorrect - Question 41 of 180
41. Question
In an Agile project, who plays the role of a servant leader?
CorrectIncorrect - Question 42 of 180
42. Question
During a retrospective, the members of the agile team mention that the agile coach’s actions during the last iteration did not align with agile best practices. To which of the following did the team most likely refer?
CorrectIncorrect - Question 43 of 180
43. Question
How should the team handle non-functional activities that are part of Definition of Done (DoD) but the Product Owner does not care much about?
CorrectIncorrect - Question 44 of 180
44. Question
You are working as an agile practitioner and in the middle of the project the developing team lead came to you mentioned that he is interested in the operation manager position which was published internally in the company. What would be your action?
CorrectIncorrect - Question 45 of 180
45. Question
Team who has recently started implementing KANBAN needs some advice from Agile coach on how to conduct daily standup meetings. If you are an Agile coach what would you recommend
CorrectIncorrect - Question 46 of 180
46. Question
A recent internal survey indicated that most employees are apprehensive about transition from waterfall to Scrum, suggesting the organization may not be ready for Agile adoption just yet. As an Agile Practitioner responsible for managing one team, what is your best option?
CorrectIncorrect - Question 47 of 180
47. Question
Exploratory tester use all the following tools EXCEPT?
CorrectIncorrect - Question 48 of 180
48. Question
A team member has been coming late to the daily scrum for past several days. What should the Scrum Master do?
CorrectIncorrect - Question 49 of 180
49. Question
Todd is a project manager of a very large software product development project that needs to be executed from five different cities. Senior management has decided to run the project using an agile approach by following the philosophies of the scrum as much as possible. What framework is most suited as per the given situation?
CorrectIncorrect - Question 50 of 180
50. Question
On the completion of the first three iterations, an agile team determined that 344 story points are required to complete the remaining project. The average team velocity in the first three iterations was 50 story points. What will be the number of iterations required for the team to complete the project?
CorrectIncorrect - Question 51 of 180
51. Question
A Development teams’ velocity is around 40 story points, and they are accepting 5, 8, 13point stories in an iteration. The team is taking high priority items needed by the business and also Product Owner regularly involved during development. But still, the team is feeling urgency pressure and as a result consistently missing out one or two user stories in the iterations. As an Agile Practitioner, what would you like to suggest?
CorrectIncorrect - Question 52 of 180
52. Question
You are the scrum master of an underperforming and burnt-out agile team. How can you best improve the team’s performance?
CorrectIncorrect - Question 53 of 180
53. Question
Susanne is the product manager for one of the critical go to market product for Foremost enterprise. IT team developing the product has chosen KANBAN methodology to deliver the product. Susanne is invited to daily standup meetings and she is quite pleased with the progress so far and quality of discussions during the daily standup meetings. She has observed that just after the daily standup meetings are complete some small groups of 2-3 team members go to different room and discuss some issue. She asks one such group on what they were discussing and she was told it was mostly some architectural or process related issues. Susanne wonders why they are not been discussed in daily standup meetings. She approached the Project Manager of the team. What should project manager do.
CorrectIncorrect - Question 54 of 180
54. Question
An agile project to develop software for a new inventory control system is in the initiation stage. Which of the following would most likely be included in the project charter?
CorrectIncorrect - Question 55 of 180
55. Question
How should an agile practitioner respond when asked what type of planning corresponds to the technique of applying incremental delivery cycles to perform the work on an agile project?
CorrectIncorrect - Question 56 of 180
56. Question
It is the Sprint Planning meeting for 3rd sprint of an 8-sprint release. One user story is too large and team decides to split it into smaller stories. There are several ways team could split user stories EXCEPT:
CorrectIncorrect - Question 57 of 180
57. Question
A development team is reviewing an iteration work undertaken for the estimation of efforts required and to give a commitment that is within the team’s calculated capacity. Which of the following is not compulsory during this review and discussion process?
CorrectIncorrect - Question 58 of 180
58. Question
Tom is a Project Manager of a software development project. During the preparation of Project Management Plan, he decides to use Agile development approach instead of traditional waterfall approach which is widely used in his organization. What has influenced him to decide agile as a development approach?
CorrectIncorrect - Question 59 of 180
59. Question
Why do we write acceptance tests?
CorrectIncorrect - Question 60 of 180
60. Question
At a walkthrough, a stakeholder, end user, and the development team identify significant new functionality required for the proposed solution to be effective. What is the next step?
CorrectIncorrect - Question 61 of 180
61. Question
A team member is constantly spending on items that are not in the sprint backlog. As a Scrum Master what should you do?
CorrectIncorrect - Question 62 of 180
62. Question
Reducing the number of items in the team’s immediate focus results in?
CorrectIncorrect - Question 63 of 180
63. Question
As per XP methodology , When XP teams perform significant analysis, design, coding and testing?
CorrectIncorrect - Question 64 of 180
64. Question
It is the Sprint Planning meeting for 3rd sprint of an 8-sprint release. One user story is too large and team decides to split it into smaller stories. There are several ways team could split user stories EXCEPT:
CorrectIncorrect - Question 65 of 180
65. Question
During Daily Scrum meeting, a junior developer (A) shares that he is stuck on an important task. A senior developer (B) who has worked on a similar item in the past offers to help. As an Agile Practitioner, what step should you take?
CorrectIncorrect - Question 66 of 180
66. Question
To increase agile knowledge, traditional project managers of a company have been paired with scrum masters to observe them lead their teams. One observation is that many project decisions are the responsibility of the project team and the scrum master is more facilitative than authoritative. In fact, the scrum masters seem more focused on ensuring that the team can focus on the work, have a shared vision, and determine how they will accomplish their work. What leadership approach have the scrum masters adopted?
CorrectIncorrect - Question 67 of 180
67. Question
A team member has been coming late to the Daily scrum despite repeated reminders from Scrum Master. How could the Scrum Master attempt to correct this behaviour?
CorrectIncorrect - Question 68 of 180
68. Question
When does a Scrum team create and elaborate user stories in detail?
CorrectIncorrect - Question 69 of 180
69. Question
You are project Manager and have been participating in initial discussion with product Managers, business and architect team to reach an agreement on work in progress limit for your team. After analyzing the nature of work and other parameters you have proposed a Work in progress limit of 50 however Business stakeholders want WIP in progress limit to be increased to 75 as there is need to faster time to market. As a Project manager what are the factors you should consider before deciding on WIP limits
CorrectIncorrect - Question 70 of 180
70. Question
The team wants to know how the product will be used, or what features will prove more popular. Of the following, what technique can help the most?
CorrectIncorrect - Question 71 of 180
71. Question
Stakeholders want to understand what progress an agile team has made in their last iteration. What should stakeholders review to determine this information?
CorrectIncorrect - Question 72 of 180
72. Question
Florian is a stakeholder in STC company. He has recently learned that the team will use an agile framework in the current project. In a planning meeting, Florian tells the team members that they are not doing formal documentation in this project as they were doing in the previous projects. How will the team members reply to his statement?
CorrectIncorrect - Question 73 of 180
73. Question
Team A is delivering 800 SP, and Team B is delivering 30 SP. Team B is going through some external interruptions after adding few resources. As an Agile Practioner, how would you define team A and team B?
CorrectIncorrect - Question 74 of 180
74. Question
In a sprint planning meeting, who is responsible for selecting the number of items for the sprint from the product Backlog?
CorrectIncorrect - Question 75 of 180
75. Question
Team was working on iteration 3 and during the testing, tester identified bugs in a story completed in iteration no 1, what should be the team’s response?
CorrectIncorrect - Question 76 of 180
76. Question
A developer has just learnt a better way of developing a feature the team just finished. He shared the details with the Scrum Master to show the possibility of improving the performance by a factor of two or more. How should the Scrum Master try to utilize this learning?
CorrectIncorrect - Question 77 of 180
77. Question
In Agile methods, project planning may take place at 3 levels, such as visioning, release planning, and iteration planning. These 3 levels are examples of what?
CorrectIncorrect - Question 78 of 180
78. Question
A team usually follows a 3-month release cycle with several 2-week sprints, but the customer is too busy to attend Sprint-end product reviews. He insists on release-end demo only. Do you anticipate a problem here?
CorrectIncorrect - Question 79 of 180
79. Question
It is day 7 of a 10-day (2-week) sprint and as developers are finishing development tasks, the testing tasks are piling up. There is a risk all stories may not get done within Sprint timelines. As a Scrum Master of a high-performing crossfunctional team, how you may best address this issue:
CorrectIncorrect - Question 80 of 180
80. Question
If the product owner said that the last sprint failed to deliver value to the project What should the scrum master mention at the next retrospective?
CorrectIncorrect - Question 81 of 180
81. Question
A newly formed development team is started writing user stories after an understanding of the features and functions. The few examples of user stories are as follows: Users can make reservations so that they can travel Show room sizes so that they can see if it fits their need . Which one of the following problem would you like to fix in these user stories?
CorrectIncorrect - Question 82 of 180
82. Question
As an Agile Coach, what is the BEST way for you to handle a complex situation during a delivery?
CorrectIncorrect - Question 83 of 180
83. Question
The velocity of an 8-member Agile team over the past few sprints has been 36, 32, 40, 46, 38 and 48 story points. In the next 2-week Sprint, there are two public holidays planned. How many points must the team plan for?
CorrectIncorrect - Question 84 of 180
84. Question
Budget & schedule should be considered as conditions of satisfaction for which phase of planning?
CorrectIncorrect - Question 85 of 180
85. Question
Todd is a directive PMO of an IT organization. As an Agile expert, he decides to promote osmotic communication across projects under his portfolio. Osmotic communication is best suited in which of the following team environments?
CorrectIncorrect - Question 86 of 180
86. Question
Which statement is true about the Sprint Burndown chart?
CorrectIncorrect - Question 87 of 180
87. Question
Due to the organizational constraints, some of the agile team members are in different parts of the country, while other team members are co-located in the same building of the organization. Which of the following agile technique would establish better communication among the team members?
CorrectIncorrect - Question 88 of 180
88. Question
Agile principles encourage the use of particularly decision models. Which of the following is FALSE about participative decision making?
CorrectIncorrect - Question 89 of 180
89. Question
A Scrum Master has helped transform a team into a high performance team. The team has learnt to self-organize itself in its daily operations with an aim to deliver business value to the customer. What could the management do with the role of the Scrum Master?
CorrectIncorrect - Question 90 of 180
90. Question
Even when six stories are picked up for Sprint, a team follows the rule not to work on more than three stories at a time. This practice is most aligned with which of the following concepts:
CorrectIncorrect - Question 91 of 180
91. Question
While working on a sprint an agile team notice that an important task on the sprint backlog will take more time than it was estimated. What should the agile team do ?
CorrectIncorrect - Question 92 of 180
92. Question
Which of the following statement is true about risk identification in agile teams?
CorrectIncorrect - Question 93 of 180
93. Question
Which of the following represents the purpose of Sprint review Meeting BEST?Which of the following represents the purpose of Sprint review Meeting BEST?
CorrectIncorrect - Question 94 of 180
94. Question
One role of an agile practitioner is to promote the knowledge and execution of agile practices within an organization. Which of the following agile practitioners is responsible for the creation and maintenance of the product roadmap?
CorrectIncorrect - Question 95 of 180
95. Question
What style of leadership should agile leader adapt?
CorrectIncorrect - Question 96 of 180
96. Question
Your company implements a requirement that teams create highly detailed documentation as part of the company-wide software development lifecycle. What is the correct response?
CorrectIncorrect - Question 97 of 180
97. Question
Assuming same team capacity, how would doubling the work in progress (WIP) affect Cycle Time?
CorrectIncorrect - Question 98 of 180
98. Question
You are a scrum master, handing a team working on an agile project. The product owner could not take part in the recent sprint planning meeting due to his other responsibilities. A team member escalates in the daily standup meeting that he needs clarification for a user story, but not able to contact the product owner to get feedback. What will you do in this situation as a scrum manager?
CorrectIncorrect - Question 99 of 180
99. Question
How is risk managed in Agile?
CorrectIncorrect - Question 100 of 180
100. Question
As an Agile Practitioner how could you ensure stakeholder vision and objectives are shared by the team?
CorrectIncorrect - Question 101 of 180
101. Question
The benefits of maintaining and making visible a prioritized list of threats and issues facing the team include the following EXCEPT:
CorrectIncorrect - Question 102 of 180
102. Question
You are the Product Owner and you see an updated burndown chart depicting the progress of the current iteration. The team is on day 10 of 30-day iteration. The card depicts the planned progress as a diagonal line in yellow. Actuals are updated each day, forming a green line. On day 10, the green line below the yellow line. What does this communicate to stakeholders?
CorrectIncorrect - Question 103 of 180
103. Question
One of your stakeholders is interested in knowing how well agile team is doing in reducing the risks iteration by iteration, which of the following information radiator can help the most?
CorrectIncorrect - Question 104 of 180
104. Question
Members of the team post updates to a graph that shows the progression of features to being ‘Done.’ Examples of the stages of progress include Backlog, Design, Development, Testing and Done. What is the name of this graph?
CorrectIncorrect - Question 105 of 180
105. Question
A team lead is currently demonstrating a potentially shippable product increment for project stakeholders. Which agile meeting is being conducted?
CorrectIncorrect - Question 106 of 180
106. Question
Your team consists of a programmer, a designer, and a tester and you are asked to provide an estimate for a user story in terms of ideal days. What is the BEST approach for providing this estimate?
CorrectIncorrect - Question 107 of 180
107. Question
You are an agile practitioner. Several members of your team have expressed concern that the project is not progressing as well as they would like. What is the best course of action?
CorrectIncorrect - Question 108 of 180
108. Question
Team is finding hard to understand one of the acceptance tests written on story cards. What is the next BEST step ?
CorrectIncorrect - Question 109 of 180
109. Question
An agile practitioner is planning to share the project status with stakeholders. What approach should the agile practitioner take?
CorrectIncorrect - Question 110 of 180
110. Question
Your Company has hired a Lean consultant. The consultant is having discussion with the team about flow of work, team roles, processes, documentation, and lesson learned. What should be the top priority of lean consultant during this review?
CorrectIncorrect - Question 111 of 180
111. Question
While most developers design and code their stories, you have an experienced architect in the team who is primarily responsible for code review of other team members to ensure consistency and quality in design. But the practice of doing code review (and possible rework) after development is complete on a story is creating friction among team members, often resulting in low morale. As an Agile Practitioner, how you may address this issue:
CorrectIncorrect - Question 112 of 180
112. Question
Which of the following approaches to agility lays great emphasis on eliminating waste:
CorrectIncorrect - Question 113 of 180
113. Question
How do you BEST describe the primary role of Agile Leader?
CorrectIncorrect - Question 114 of 180
114. Question
Who comes up with the definition of done for a feature?
CorrectIncorrect - Question 115 of 180
115. Question
How does release plan help?
CorrectIncorrect - Question 116 of 180
116. Question
At the sprint retrospective meeting, the team lead drew a fishbone diagram, wrote a problem at the head of the fish, and labeled the bones of the fish with categories. What should the team do next?
CorrectIncorrect - Question 117 of 180
117. Question
Which of the following is an example of Avoid risk response category?
CorrectIncorrect - Question 118 of 180
118. Question
Your project sponsor wants to know if the product you’re building will be ready to demo at a trade show.What do you tell him ?
CorrectIncorrect - Question 119 of 180
119. Question
You are the Scrum master and having a conversation with one business stakeholders Joy, Joy asked, how do business people interact with development team? For instance, business people only understand the business benefit of possible feature where the development team speaks about technology, what brings both of them on the same page? You said :
CorrectIncorrect - Question 120 of 180
120. Question
You are a project manager of a software development project that is following agile –scrum framework. The product owner and the development team has finalized a clear sprint goal for the upcoming sprint. Who determines how the scrum team will accomplish the goal?
CorrectIncorrect - Question 121 of 180
121. Question
During the project, the product owner knows from the sponsor that a major component, which is already 20 percent completed, is not needed anymore for the users. The component was part of the approved scope. As a product owner what should you do next?
CorrectIncorrect - Question 122 of 180
122. Question
A development team is just diving into a big project with hundreds of stories. The team needs the visual depiction of product releases and the main components of each release. each. Which one of the following tool is the best Solution: for the same?
CorrectIncorrect - Question 123 of 180
123. Question
Customer calls the Scrum Master and requests an urgent feature to be added to the current Sprint. What should the Scrum Master do?Customer calls the Scrum Master and requests an urgent feature to be added to the current Sprint. What should the Scrum Master do?
CorrectIncorrect - Question 124 of 180
124. Question
Why does an Agile team need to elicit and prioritize important non-functional requirements (such as security and performance) early on?
CorrectIncorrect - Question 125 of 180
125. Question
In an Agile Software development project, a tester is writing a test before work related to coding has begun. Which of the following technical practices is mentioned in the given scenario?
CorrectIncorrect - Question 126 of 180
126. Question
A Release burndown chart is showing burn up, what could be the possible reason?
CorrectIncorrect - Question 127 of 180
127. Question
Which approach is BEST for estimating Agile Projects while doing the release planning?
CorrectIncorrect - Question 128 of 180
128. Question
What is the most important reason why Product Owner needs to be present in Sprint Planning meeting?
CorrectIncorrect - Question 129 of 180
129. Question
Which could be the best possible approach for Splitting Epic?
CorrectIncorrect - Question 130 of 180
130. Question
Some Product owners use riskadjusted backlog in agile projects. Which of the following is true regarding a riskadjusted backlog?
CorrectIncorrect - Question 131 of 180
131. Question
Team with Product Owner have started sprint planning meeting for Sprint #3. Release duration is 4 months with 5 sprints. PO presents sprint goals and team is seeking clarification for one of the use stories. PO provides required explanation however she also mentions that for her to approve the user story in demo she need to have these three functionalities done and demonstrated in right way. Team has some doubts and discusses further with PO. After the discussion PO agrees to need of only two features to be demonstrated by team for her to approve the story. What team is doing in this scenari
CorrectIncorrect - Question 132 of 180
132. Question
The newly-organized agile project team is creating the schedule management plan, they documented time-boxed periods for releases, waves, and iterations for the project. What is the project team trying to achieve by documenting time-boxed periods for each iteration?
CorrectIncorrect - Question 133 of 180
133. Question
To compensate for the loss of productivity due to inefficient communication in a distributed team environment, management created a team of 14 members. But, the team is performing far below expectations. What should the management do next?
CorrectIncorrect - Question 134 of 180
134. Question
An Agile project using scrum methodology with relatively fixed scope is running behind schedule for last 3 sprints. What may be the reason for such a delay?
CorrectIncorrect - Question 135 of 180
135. Question
The customer tells you in the middle of the release that one feature that is already in progress is no longer required. This feature is an epic and significant effort has already gone into the development. What should the team do next?
CorrectIncorrect - Question 136 of 180
136. Question
Scrum is a popular agile framework. Which of the following represents a scrum artifact?
CorrectIncorrect - Question 137 of 180
137. Question
What trend does the top of the bar indicate in a release burndown bar chart?
CorrectIncorrect - Question 138 of 180
138. Question
A vice president of product management company taken the role of Product Owner for a business critical product. He is ideally suited to ensure product vision better, but he is struggling to spend enough time with the team. He is thinking to have a proxy for the lower level detailing of requirements. Who makes the best User Proxies?
CorrectIncorrect - Question 139 of 180
139. Question
During an iteration planning meeting, the team is estimating the size of the effort for each story by assigning each story to a shirt size of XS, S, M, L, XL or XXL. Which estimation method is being used?
CorrectIncorrect - Question 140 of 180
140. Question
Team has finished release planning meeting and agreed on condition of satisfaction, priority of backlog items, team velocity, etc. There are some large features that were not estimated, however team decided to split them closer to development. Few sprints have passed, but team has not been able to update release plan due to time constraints. During Sprint Planning, team decides to split one large feature into 4 smaller stories based on operational boundaries. Unfortunately, there is not enough capacity in the current iteration, so team can include only 2 of the 4 stories in this sprint. When team demonstrates the product increment during the sprint review meeting, the PO refuses to accept these two user stories that the team had marked as Done. What could have potentially gone wrong?
CorrectIncorrect - Question 141 of 180
141. Question
A development team is fully aware of their decisions, and consequences too. The whole development team have goals to achieve but are not directed how to achieve them. They are free to manage their work and can enhance their skills contineously. How would you describe this team?
CorrectIncorrect - Question 142 of 180
142. Question
As Scrum Master, you assess that the competitive market has shifted and the product the team is building is no longer viable.What should you do?
CorrectIncorrect - Question 143 of 180
143. Question
A set of related user stories that may be combined together and treated as a single entity for either estimating or release planning is referred to as
CorrectIncorrect - Question 144 of 180
144. Question
During the last sprint of a software development project which is being executed by following scrum framework, a key stakeholder requests a change which may improve the performance of the final product but may also affect the planned schedule. What should the product owner do?
CorrectIncorrect - Question 145 of 180
145. Question
Senior management calls the Product Owner to understand the detailed project status. What should the Product Owner do?
CorrectIncorrect - Question 146 of 180
146. Question
When is a user story (or feature) usually estimated by a Scrum team?
CorrectIncorrect - Question 147 of 180
147. Question
An established team of 8 members is known for higher performance and low defect rates. They usually pick 20-25 stories for execution during their 30-day sprint. As an Agile Practitioner, what do you think the team could try to step up their agility?
CorrectIncorrect - Question 148 of 180
148. Question
A junior developer took 12 hours to complete a relatively complex task that was estimated by the team as a 4-hour task. How should an agile team handle such a case?
CorrectIncorrect - Question 149 of 180
149. Question
Who writes the User Stories
CorrectIncorrect - Question 150 of 180
150. Question
While transitioning from Waterfall to Agile, a team of 25 decides to create two development teams and one testing team, where the output of current development iterations is tested in the next testing iteration. This practice is likely to increase the following types of wastes EXCEPT:
CorrectIncorrect - Question 151 of 180
151. Question
The ongoing sprint for a software development project that is being executed by following Agile – Scrum development approach needs to be cancelled as the sprint goal has become obsolete due to a sudden change in law associated to IT security.
CorrectIncorrect - Question 152 of 180
152. Question
How does an agile team go about developing a schedule?
CorrectIncorrect - Question 153 of 180
153. Question
An agile team is working on a project for which the user stories have not been tested sufficiently. What could be the reason behind it?
CorrectIncorrect - Question 154 of 180
154. Question
You have been appointed as the Servant Leader for your company’s latest software development project running in agile framework. Which of the following defines your role?
CorrectIncorrect - Question 155 of 180
155. Question
You are the scrum master and you notice that over the last 6 iterations, the number escaped defects has gradually increased. Yet the numbers are not alarming, but the trend is not favourable. What should you do first?
CorrectIncorrect - Question 156 of 180
156. Question
While the team is prioritizing features for the next iteration, they drop some feature from backlog, which features should the agile team drop it?
CorrectIncorrect - Question 157 of 180
157. Question
Two teams are working on different projects. Team A averages 20 points per iteration and team B averages 35. What can be said about the performance of the two teams?
CorrectIncorrect - Question 158 of 180
158. Question
In a typical agile project, Product backlog is the repository for product scope. Who owns the product backlog?
CorrectIncorrect - Question 159 of 180
159. Question
The velocity of a team went down because Product Owner did not provide requirement clarification to the team. What should the Scrum Master do?
CorrectIncorrect - Question 160 of 180
160. Question
Which of the following Agile principles helps to promote elimination of wastes thereby minimizing scope creep and encouraging to do only those categories of work that generates business value?
CorrectIncorrect - Question 161 of 180
161. Question
Tom is a Servant leader of a complex software development project that is running using Agile development approach. Two developers are having difference in opinion about the technical approach of a user story. What needs to be done in this situation?
CorrectIncorrect - Question 162 of 180
162. Question
Which of the following is not an example of the four values of the Agile Manifesto?
CorrectIncorrect - Question 163 of 180
163. Question
The Scrum Master explains the three primary roles in Scrum to the newly hired team member. Which role is sometimes called ‘the voice of the customer’?
CorrectIncorrect - Question 164 of 180
164. Question
What role Product Owner plays in the sprint planning meeting?
CorrectIncorrect - Question 165 of 180
165. Question
Your team is in a good place; your velocity is gaining momentum with each new Sprint, and then suddenly your star developer turns in his resignation. Which one of the following practice will support the team best?
CorrectIncorrect - Question 166 of 180
166. Question
You are leading a team with an average velocity of 65 points per iteration.Another team of the same size in your organizationis working on aproject with similar complexity. The other team’s velocityis averaging 90 points per month.Your team should:
CorrectIncorrect - Question 167 of 180
167. Question
An agile practitioner needs to track the work completed by the team over time. How might the agile practitioner accomplish this task?
CorrectIncorrect - Question 168 of 180
168. Question
You are project Manager and have been participating in initial discussion with product Managers, business and architect team to reach an agreement on work in progress limit for your team. After analyzing the nature of work and other parameters you have proposed a Work in progress limit of 50 however Business stakeholders want WIP in progress limit to be increased to 75 as there is need to faster time to market. As a Project manager what are the factors you should consider before deciding on WIP limits
CorrectIncorrect - Question 169 of 180
169. Question
In the mid of a software development project, a project stakeholder requests the scrum master for adding a new feature that will increase the project cost and schedule. What should the Scrum Master do next?
CorrectIncorrect - Question 170 of 180
170. Question
A development team continuously showing predictable velocity trends when estimating user stories of size 1, 2, or 3 points but does not have a good track record with stories sized at 5 points and above. What could be the reason behind this special bad track record?
CorrectIncorrect - Question 171 of 180
171. Question
The development team experimented with a possible technical approach that showed promise of providing significant performance gains, but things didn’t go well. In the end, the story could not be finished within the sprint. What is the lesson learnt from this experience?
CorrectIncorrect - Question 172 of 180
172. Question
Average velocity of a team over past several sprints has been 30 story points. In the current Sprint, two stories got stuck due to external dependencies and ended up bringing down team velocity to 20 story points. How many story points should the team pick for execution in the upcoming sprint?
CorrectIncorrect - Question 173 of 180
173. Question
There are 5 levels of planning that are common to agile projects. If we list them from high-level to low-level planning, which of the following represents the correct sequence?
CorrectIncorrect - Question 174 of 180
174. Question
In Scrum, how does developing pIn Scrum, how does developing product over multiple time-boxed sprints help in managing requirements:roduct over multiple time-boxed sprints help in managing requirements:
CorrectIncorrect - Question 175 of 180
175. Question
An agile practitioner is explaining the Agile Manifesto to some end users in advance of a new project. Which of the following would the agile practitioner say is preferred in an agile project?
CorrectIncorrect - Question 176 of 180
176. Question
In evaluating an agile project, which of the following metrics would you use to compare effectiveness of two agile team / projects?
CorrectIncorrect - Question 177 of 180
177. Question
The team meets for the sprint planning meeting. Regarding the product backlog, what is the correct expectation of the team?
CorrectIncorrect - Question 178 of 180
178. Question
Based on the velocity determined after completing several iterations, agile team members assume that they will be unable to meet the release deadline. What should the team do?
CorrectIncorrect - Question 179 of 180
179. Question
An agile team is in the process of adopting XP practices and is keen to have a co-located customer. But the customer team being in a different continent, customer co-location is not really an option. What is the next reasonable option for the long term?
CorrectIncorrect - Question 180 of 180
180. Question
In a Scrum project, the term “done” is BEST described when a deliverable is:
CorrectIncorrect